Building construction requires selecting efficient construction methods to achieve the desired project objectives. This research aims to compare conventional and modular construction methods in the implementation of walls and floor plates, with a focus on cost and time analysis. The case study taken is the construction of the Satpol PP Building. This research method uses a quantitative approach by collecting primary and secondary data. Primary data was obtained through field observations and interviews with parties involved in the project, while secondary data was obtained from project documents, literature and other related references. Data analysis was carried out with comparing the total costs and time required for each construction method.

References

Andika, Walangitan, D. R. O., & Arsjad, T. T. (2022). Metode Pelaksanaan Konstruksi Pengecoran Pelat Lantai Pada Pembangunan Jembatan Boulevard II. Tekno, 20(82), 1163–1178.

Christofher, L. (2020). Analisa Perbandingan Metode Konvensional Dan Metode Flat Slab Pada Struktur Plat Lantai Di Proyek Pembangunan Kaliban School. UIB Repository, 4–8.

Depi Nur Pajriah. (2022). Pelaksanaan Pekerjaan Plat Lantai Dengan Beton Precast Pada Proyek Penataan Ggm Tahap 1. Seminar Teknologi Majalengka (Stima), 6, 239–249. https://doi.org/10.31949/stima.v6i0.709

Dinus, R. (2017). Metode Jalur Kritis (CPM). Cpm, 24–35.

Ervianto, W. I. (2008). Potensi Penggunaan Sistem Modular Pada Proyek Konstruksi. Jurnal Teknik Sipil, 8(2), 170–183.

Firdaus, I. A. S. (2019). Perbandingan Estimasi Biaya Pekerjaan Dinding Bata Merah, Bata Ringan, Batako Dan M Panel. 11–29.

Handayani, E., Nuklirullah, M., & Gafur, E. (2021). Analisa Perbandingan Koefisien Harga Satuan Bahan Material Pekerjaan Revitalisasi Pasar Rakyat Desa Tanjung Type D. Jurnal Talenta Sipil, 4(2), 170. https://doi.org/10.33087/talentasipil.v4i2.71

Najoan, C. H., Tjakra, J., & Pratasis, P. A. K. (2016). Analisis Metode Pelaksanaan Plat Precast Dengan Plat Konvensional Ditinjau Dari Waktu Dan Biaya (Studi Kasus : Markas Komando Daerah Militer Manado). Jurnal Sipil Statik, 4(5), 319–327.

Rani, H. A. (2016). Manajemen Proyek Konstruksi. 99.

Al-Salem, S. M. (2017). A review on thermal and catalytic pyrolysis of plastic solid waste (PSW). Journal of Environmental Management, 197, 177–198. https://doi.org/10.1016/j.jenvman.2017.03.084

Cabeza, L. F. (2014). Life cycle assessment (LCA) and life cycle energy analysis (LCEA) of buildings and the building sector: A review. Renewable and Sustainable Energy Reviews, 29, 394–416. https://doi.org/10.1016/j.rser.2013.08.037

Curtarolo, S. (2013). The high-throughput highway to computational materials design. Nature Materials, 12(3), 191–201. https://doi.org/10.1038/nmat3568

Isangula, K. (2023). The perceived benefits and effectiveness of patient feedback systems in strengthening patient-provider relationships in Rural Tanzania. BMC Health Services Research, 23(1). https://doi.org/10.1186/s12913-023-10198-z

Kohonen, T. (2013). Essentials of the self-organizing map. Neural Networks, 37, 52–65. https://doi.org/10.1016/j.neunet.2012.09.018

Ramage, M. H. (2017). The wood from the trees: The use of timber in construction. Renewable and Sustainable Energy Reviews, 68, 333–359. https://doi.org/10.1016/j.rser.2016.09.107

Rasheed, A. (2020). Digital twin: Values, challenges and enablers from a modeling perspective. IEEE Access, 8, 21980–22012. https://doi.org/10.1109/ACCESS.2020.2970143

Rasheed, R. A. (2020). Challenges in the online component of blended learning: A systematic review. Computers and Education, 144. https://doi.org/10.1016/j.compedu.2019.103701

Xia, Z. (2016). A Secure and Dynamic Multi-Keyword Ranked Search Scheme over Encrypted Cloud Data. IEEE Transactions on Parallel and Distributed Systems, 27(2), 340–352. https://doi.org/10.1109/TPDS.2015.2401003

Zarfl, C. (2015). A global boom in hydropower dam construction. Aquatic Sciences, 77(1), 161–170. https://doi.org/10.1007/s00027-014-0377-0

Zhou, K. (2016). Industry 4.0: Towards future industrial opportunities and challenges. 2015 12th International Conference on Fuzzy Systems and Knowledge Discovery, FSKD 2015, 2147–2152. https://doi.org/10.1109/FSKD.2015.7382284

Downloads

Published

2024-09-22

How to Cite

Firdaus Nurfuadi. (2024). Comparative Analysis of The Implementation Of Conventional And Modular Methods On Walls And Floor Plates In Terms Of Cost And Time (Case Study: Construction Of Satpol PP Building). Sustainable Civil Building Management and Engineering Journal, 1(3). https://doi.org/10.47134/scbmej.v1i3.3210

Issue

Section

Articles

Similar Articles

<< < 1 2 3 

You may also start an advanced similarity search for this article.