Vol. 1 No. 3 (2024): July
Articles
-
Cost Budget Analysis for Equal Distribution of Labour for Multi-Storey Buildings Construction
Abstract view : 18 times | Download: 6 times | DOI : https://doi.org/10.47134/scbmej.v1i3.2439
-
Analisis Perbandingan Efesiensi Biaya dan Waktu pada Pondasi Sumuran dan Pondasi Tapak Pembangunan Gedung Tipikor Polda Aceh
Abstract view : 71 times | Download: 4 times | DOI : https://doi.org/10.47134/scbmej.v1i3.2149
-
Material Planning Analysis with Material Requirement Planning Method in High-rise Building Projects
Abstract view : 12 times | Download: 9 times | DOI : https://doi.org/10.47134/scbmej.v1i3.2438