Comparative Analysis of Conventional Methods with BIM Methods on Construction Cost Estimate at Structure Project Design Calculations (Case Study of Construction of A Satpol PP Building)

Authors

  • Nadira Zalfa Ulinnuha Civil Engineering Study Program, Faculty of Engineering, Sebelas Maret University
  • Fajar Sri Handayani Civil Engineering Study Program, Faculty of Engineering, Sebelas Maret University
  • Muji Rifai Civil Engineering Study Program, Faculty of Engineering, Sebelas Maret University

DOI:

https://doi.org/10.47134/scbmej.v1i4.2698

Keywords:

Building Information Modeling, Construction Cost Estimate, Revit, Structure

Abstract

Construction cost estimate in construction projects requires high accuracy in calculating work volumes and applying unit cost analysis. Lack of accuracy in calculating the volume of work can result in inaccurate cost estimates, causing project budget overruns. This research discusses the use of 3D BIM planning concepts using Autodesk Revit software to help calculate volumes accurately, with the aim of reducing project budget overruns. Comparative analysis of cost estimates between the use of Autodesk Revit and conventional methods provides an overview of the efficiency and effectiveness of using BIM software in estimating construction project costs. The object of this research is the Satpol PP Bantul office construction project, with a focus on structural work. This research method includes data collection, 3D BIM modeling, calculating cost estimates based on the volume produced using unit cost analysis, and comparative analysis of cost estimates between the use of BIM software and conventional methods. Based on the research results, it found that the construction cost estimate for structural work from Revit had a value of IDR 862,330,518.59 and a difference of IDR 53,420,195.31. This shows that the use of the 3D BIM concept results in 5.83% cheaper calculations than conventional construction cost estimate methods.

References

Abdel-Hamid, M. (2023). Project cost control using five dimensions building information modelling. International Journal of Construction Management, 23(3), 405–409. https://doi.org/10.1080/15623599.2021.1880313

Aman, Y., Setiawan, E. B., & Abma, V. (2021). Prosiding CEEDRiMS 2021 Inovasi Teknologi dan Material Terbarukan Menuju Infrastruktur PENERAPAN KONSEP BIM DARI STUDI KASUS DAN PERSPEKTIF PENGGUNA.

Apriyansyah Risky. (2021). Implementasi Konsep Building Information Modelling (Bim) Dalam Estimasi Quantity Take Off Material Pekerjaan Struktural Implementation The Concept Of Building Information Modelling (Bim) In The Estimation Of Quantity Take Off Materials Of Structural Work.

Arya Prio Pamungkas. (2017). 178110079 - Arya Prio Pamungkas Fulltext.

CRC Construction Innovation. (2007). Adopting BIM for facilities management Solutions for managing the Sydney Opera House.

Endro Yuwono, B., & Rayshanda, R. (2018). Manfaat Penggunaan Building Information Modelling (Bim) Pada Proyek Konstruksi Sebagai Media Komunikasi Stakeholders.

Ervianto. (2005). Manajemen_Proyek_Konstruksi_Edisi_Revisi.

Ghorbany, S. (2023). BIM-based solution to enhance the performance of public-private partnership construction projects using copula bayesian network. Expert Systems with Applications, 216. https://doi.org/10.1016/j.eswa.2023.119501

Laorent, D., Nugraha, P., & Budiman, J. (2019). Analisa Quantity Take-Off Dengan Menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1), 1–8. https://doi.org/10.9744/duts.6.1.1-8

Lee, X. S., Tsong, W., & Khamidi, M. F. (2016). 5D Building Information Modelling-A Practicability Review. https://doi.org/10.1051/00026

Leite, G. S. (2023). Management of Construction Waste in an Urban Development Using BIM Technology. Revista de Gestao Social e Ambiental, 17(9). https://doi.org/10.24857/rgsa.v17n9-009

Li, X. (2024). Digital Application of Construction Project Cost Risk Control and Management Based on BIM Technology. Applied Mathematics and Nonlinear Sciences, 9(1). https://doi.org/10.2478/amns-2024-0529

Liu, T. (2024). Novel Probabilistic Approach for Quantification of Cost-Overruns Risk and Determination of Primary Causes. Mathematical Problems in Engineering, 2024. https://doi.org/10.1155/2024/8893201

Luqman Alghifarry. (2017). S1-2017-330418-abstract.

Mollaei, A. (2023). Assessing the impact of policy tools on building material recovery. Resources, Conservation and Recycling, 198. https://doi.org/10.1016/j.resconrec.2023.107188

Nurohmah Ike Mabrur. (2023). Lembar Pengesahan Sidang Progam Studi Teknik Sipil Fakultas Teknik Universitas Mercu Buana.

Ojeda, J. M. P. (2024). Estimation of the Physical Progress of Work Using UAV and BIM in Construction Projects. Civil Engineering Journal (Iran), 10(2), 362–383. https://doi.org/10.28991/CEJ-2024-010-02-02

Porwal, A. (2023). The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. International Journal of Construction Management, 23(1), 156–166. https://doi.org/10.1080/15623599.2020.1854930

Rofiudin, M., Rasidi, N., Damar Pandulu, G., Archikon, P. T., & Surabaya, W. (2017). Manajemen Metode Pelaksanaan Pada Konstruksi Baja Model “Space Frame” Proyek Terminal 3 Ultimate Bandar Soekarno Hatta. (Studi Kasus Pelaksanaan Proyek Terminal 3 Ultimate Bandara Soekarno Hatta)". In Jurnal Reka Buana (Vol. 2, Issue 2).

Rodrigues, M. R. (2023). Benefits and challenges to applying IPD: experiences from a Norwegian mega-project. Construction Innovation, 23(2), 287–305. https://doi.org/10.1108/CI-03-2021-0042

Sangadji, S., Kristiawan, S., & Inton Kurniawan Saputra, dan. (2019). Pengaplikasian Building Information Modeling (BIM) Dalam Desain Bangunan Gedung.

Soemardi, B. W. (2014). Simposium Nasional RAPI XIII-2014 FT UMS.

Son, R. H. (2023). Automated Model-Based 3D Scan Planning for Prefabricated Building Components. Journal of Computing in Civil Engineering, 37(2). https://doi.org/10.1061/(ASCE)CP.1943-5487.0001055

Tigauw, F. M., Aprilianto, F., & Santoso, H. T. (2023). Analisa Perhitungan Quantity Material Take-Off (QMTO) Struktur Bawah Jembatan Tipe Skew dengan Menggunakan BIM Autodesk Revit. Jurnal Inovasi Konstruksi, 2(2), 58–65. https://doi.org/10.56911/jik.v2i2.44

Downloads

Published

2024-06-11

How to Cite

Ulinnuha, N. Z., Handayani, F. S., & Rifai, M. (2024). Comparative Analysis of Conventional Methods with BIM Methods on Construction Cost Estimate at Structure Project Design Calculations (Case Study of Construction of A Satpol PP Building). Sustainable Civil Building Management and Engineering Journal, 1(4), 12. https://doi.org/10.47134/scbmej.v1i4.2698

Issue

Section

Articles