Manajemen Konflik Pembangunan Tower Telkomsel dengan Masyarakat di Kelurahan Talang Jambe Kota Palembang
DOI:
https://doi.org/10.47134/jsd.v1i2.1880Keywords:
conflict management, tower, talang jambeAbstract
Technological advances are currently growing rapidly, moreover the telecommunications sector is experiencing exponential growth. When they wanted to build a tower on one of the residents' lands, there was a slight obstacle, namely the occurrence of conflict in the community. Conflict is an event or social phenomenon that is part of the dynamics of human life. Often conflicts have a negative impact on conflicting parties such as the emergence of ongoing hostilities, material losses and even fatalities. Even so, conflict can also be a supporting aspect in a better survival. This can happen if the conflict can be managed properly and is able to take advantage of the conditions or background of the conflict which can unite the conflicting parties. In this article, the author seeks to make an effort to solve problems in conflict management in the form of mediation of conflicts that occurred in Talang Jambe, Palembang City, which involved the community, RT, and Telkomsel.
References
Chang, W. (2018). Development of an observational checklist for falling risk assessment of high-voltage transmission tower construction workers. International Journal of Industrial Ergonomics, 68, 73–81. https://doi.org/10.1016/j.ergon.2018.06.011 DOI: https://doi.org/10.1016/j.ergon.2018.06.011
Chen, Y. (2022). Safety supervision of tower crane operation on construction sites: An evolutionary game analysis. Safety Science, 152. https://doi.org/10.1016/j.ssci.2021.105578 DOI: https://doi.org/10.1016/j.ssci.2021.105578
Danel, T. (2021). Proposal for tower crane productivity indicators based on data analysis in the era of construction 4.0. Buildings, 11(1), 1–15. https://doi.org/10.3390/buildings11010021 DOI: https://doi.org/10.3390/buildings11010021
Dasović, B. (2019). Active BIM approach to optimize work facilities and tower crane locations on construction sites with repetitive operations. Buildings, 9(1). https://doi.org/10.3390/buildings9010021 DOI: https://doi.org/10.3390/buildings9010021
Deng, N. (2021). Intelligent active correction technology and application of tower displacement in arch bridge cable lifting construction. Applied Sciences (Switzerland), 11(21). https://doi.org/10.3390/app11219808 DOI: https://doi.org/10.3390/app11219808
Duan, L. (2019). Vibration characteristic of high-voltage tower influenced by adjacent tunnel blasting construction. Shock and Vibration, 2019. https://doi.org/10.1155/2019/8520564 DOI: https://doi.org/10.1155/2019/8520564
Gou, H. (2021). Construction Monitoring of Self-Anchored Suspension Bridge with Inclined Tower. Journal of Bridge Engineering, 26(10). https://doi.org/10.1061/(ASCE)BE.1943-5592.0001777 DOI: https://doi.org/10.1061/(ASCE)BE.1943-5592.0001777
Heryuni, Y. (2018). Sistem Penyewaan Tower PT Telkomsel.
Hu, Y. (2020). Dynamic analysis of offshore steel wind turbine towers subjected to wind, wave and current loading during construction. Ocean Engineering, 216. https://doi.org/10.1016/j.oceaneng.2020.108084 DOI: https://doi.org/10.1016/j.oceaneng.2020.108084
Hyun, H. (2021). Tower crane location optimization for heavy unit lifting in high-rise modular construction. Buildings, 11(3). https://doi.org/10.3390/buildings11030121 DOI: https://doi.org/10.3390/buildings11030121
Jung, M. F. (2020). Robot-Assisted Tower Construction—A Method to Study the Impact of a Robot’s Allocation Behavior on Interpersonal Dynamics and Collaboration in Groups. ACM Transactions on Human-Robot Interaction, 10(1). https://doi.org/10.1145/3394287 DOI: https://doi.org/10.1145/3394287
Kim, J. Y. (2021). Priority of accident cause based on tower crane type for the realization of sustainable management at Korean construction sites. Sustainability (Switzerland), 13(1), 1–15. https://doi.org/10.3390/su13010242 DOI: https://doi.org/10.3390/su13010242
Kim, K. Y. (2022). Construction of bulk solutions for towers of pole-skipping points. Physical Review D, 105(12). https://doi.org/10.1103/PhysRevD.105.126011 DOI: https://doi.org/10.1103/PhysRevD.105.126011
Lu, Y. (2022). Wind-induced vibration assessment of tower cranes attached to high-rise buildings under construction. Automation in Construction, 135. https://doi.org/10.1016/j.autcon.2022.104132 DOI: https://doi.org/10.1016/j.autcon.2022.104132
Ma, B. (2018). Design and Research on Intermediate Tower & Pre-Deflection of Saddles in the Construction of Oujiang River North Estuary Bridge. Bridge Construction, 48(6), 41–46.
Motyčka, V. (2022). Effective Use of Tower Cranes over Time in the Selected Construction Process. Buildings, 12(4). https://doi.org/10.3390/buildings12040436 DOI: https://doi.org/10.3390/buildings12040436
Pulatsu, B. (2022). Study of the effect of construction techniques on the seismic capacity of ancient dry-joint masonry towers through DEM. European Journal of Environmental and Civil Engineering, 26(9), 3913–3930. https://doi.org/10.1080/19648189.2020.1824823 DOI: https://doi.org/10.1080/19648189.2020.1824823
Riga, K. (2020). Mixed integer programming for dynamic tower crane and storage area optimization on construction sites. Automation in Construction, 120. https://doi.org/10.1016/j.autcon.2020.103259 DOI: https://doi.org/10.1016/j.autcon.2020.103259
Riswandi, I. D. C. (2018). Evaluasi Kinerja Pembangunan Program Kerja Base Transceiver Station (BTS) Menggunakan Logical Framework Analysis.
Tarhini, H. (2021). The traveling salesman puts-on a hard hat – Tower crane scheduling in construction projects. European Journal of Operational Research, 292(1), 327–338. https://doi.org/10.1016/j.ejor.2020.10.029 DOI: https://doi.org/10.1016/j.ejor.2020.10.029
Tian, Y. P. (2019). Study on the TMD damping of wind turbine towers in construction. Gongcheng Lixue/Engineering Mechanics, 36, 184–188. https://doi.org/10.6052/j.issn.1000-4750.2018.06.S037
Tribunnews. (2020). Syarat Pembangunan Tower Telekomunikasi Harus Ada Persetujuan Warga. https://sumsel.tribunnews.com/2020/08/19/ini-10-syarat-pembangunan-tower-telekomunikasi-harus-ada-persetujuan-warga
Wang, X. (2019). Accelerated Construction of Self-Anchored Suspension Bridge Using Novel Tower-Girder Anchorage Technique. Journal of Bridge Engineering, 24(5). https://doi.org/10.1061/(ASCE)BE.1943-5592.0001383 DOI: https://doi.org/10.1061/(ASCE)BE.1943-5592.0001383
Wang, Z. (2019). Key Techniques for Rotation Construction of Asymmetric Single-Tower Hybrid Girder Cable-Stayed Bridge. Bridge Construction, 49(4), 108–112.
Wu, K. (2020). Spatio-temporal planning for tower cranes in construction projects with simulated annealing. Automation in Construction, 111. https://doi.org/10.1016/j.autcon.2019.103060 DOI: https://doi.org/10.1016/j.autcon.2019.103060
Zhang, W. M. (2021). Cable Shape and Construction Parameters of Triple-Tower Double-Cable Suspension Bridge with Two Asymmetrical Main Spans. Journal of Bridge Engineering, 26(2). https://doi.org/10.1061/(ASCE)BE.1943-5592.0001674 DOI: https://doi.org/10.1061/(ASCE)BE.1943-5592.0001674
Zhang, Z. (2021a). Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction. Automation in Construction, 127. https://doi.org/10.1016/j.autcon.2021.103709 DOI: https://doi.org/10.1016/j.autcon.2021.103709
Zhang, Z. (2021b). Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction. Automation in Construction, 130. https://doi.org/10.1016/j.autcon.2021.103854 DOI: https://doi.org/10.1016/j.autcon.2021.103854
Zhang, Z. (2022). Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(7), 2615–2634. https://doi.org/10.1108/ECAM-03-2021-0192 DOI: https://doi.org/10.1108/ECAM-03-2021-0192
Zhou, W. (2018). Tower crane safety on construction sites: A complex sociotechnical system perspective. Safety Science, 109, 95–108. https://doi.org/10.1016/j.ssci.2018.05.001 DOI: https://doi.org/10.1016/j.ssci.2018.05.001
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Revi Mariska, Muchlis Minako
This work is licensed under a Creative Commons Attribution 4.0 International License.