Penolakan Masyarakat Terhadap Pembangunan Tower Telekomunikasi di Wilayah Ilir Barat II Kota Pelembang
DOI:
https://doi.org/10.47134/jsd.v1i1.1872Keywords:
tower, radiation, societyAbstract
Analysis of the impact of the Telecommunication Tower construction is one of the studies used to identify the impact of tower construction due to changes in land use, resulting in rejection by the community which will affect the development process. The purpose of writing this research is to find out the impact of the tower and how the construction process will go if the community refuses. In the area of Jalan Ki Gede Ing Suro Rt 28 Kel 32 Ilir Palembang, The research method used in this study is a qualitative research method. Qualitative research is used to understand the context of research by describing in detail and depth related to the conditions experienced by a context as well as what is happening in the field.
References
Athaya, B. F. (2023). Identification Factors of Safety Climate, Awareness, and Behaviors to Improve Safety Performance in Telecommunication Tower Construction at PT X. Lecture Notes in Civil Engineering, 225, 651–658. https://doi.org/10.1007/978-981-16-9348- 9_57 DOI: https://doi.org/10.1007/978-981-16-9348-9_57
Chen, A. R. (2021). Study of Buffeting Response and Wind-Induced Vibration Comfort of a Steel Pylon with a Tower Crane in Construction Stage. Bridge Construction, 51(5), 20–28.
Chung, D. (2021). Alternative Tower Field Construction for Quantum Implementation of the AES S-box. IEEE Transactions on Computers. https://doi.org/10.1109/TC.2021.3135759 DOI: https://doi.org/10.1109/TC.2021.3135759
Dasović, B. (2019). Active BIM approach to optimize work facilities and tower crane locations on construction sites with repetitive operations. Buildings, 9(1). https://doi.org/10.3390/buildings9010021 DOI: https://doi.org/10.3390/buildings9010021
Forcael, E. (2020). The Effects of Temporary Tower Cranes on the Construction Process and Seismic Behavior of Reinforced Concrete Buildings. KSCE Journal of Civil Engineering, 24(2), 580–595. https://doi.org/10.1007/s12205-020-1257-x DOI: https://doi.org/10.1007/s12205-020-1257-x
Hu, C. (2020). Research on Construction Method, Risk Identification and Evaluation Technology of UHV AC Composite Cross Arm Pole and Tower. IOP Conference Series: Materials Science and Engineering, 751(1). https://doi.org/10.1088/1757- 899X/751/1/012072 DOI: https://doi.org/10.1088/1757-899X/751/1/012072
Huang, H. (2022). Research on safety assessment and protection technology of joint construction of high voltage tower and 5g base station. 2022 IEEE International Conference on High Voltage Engineering and Applications, ICHVE 2022. https://doi.org/10.1109/ICHVE53725.2022.9961420 DOI: https://doi.org/10.1109/ICHVE53725.2022.9961420
Hyun, H. (2021). Tower crane location optimization for heavy unit lifting in high-rise modular construction. Buildings, 11(3). https://doi.org/10.3390/buildings11030121 DOI: https://doi.org/10.3390/buildings11030121
Kim, J. Y. (2021). Priority of accident cause based on tower crane type for the realization of sustainable management at Korean construction sites. Sustainability (Switzerland), 13(1), 1–15. https://doi.org/10.3390/su13010242 DOI: https://doi.org/10.3390/su13010242
Li, J. (2023). The Key Technology of Quality Safety Risk Identification and Early Warning of Transmission Tower Construction based on Multi-Source Information Intelligent Learning. Proceedings - 2023 Panda Forum on Power and Energy, PandaFPE 2023, 1416–1423. https://doi.org/10.1109/PandaFPE57779.2023.10141010 DOI: https://doi.org/10.1109/PandaFPE57779.2023.10141010
Maltezos, J. (2018). Construction of the ventilation towers at Tottenham Court Road Elizabeth line station. Structural Engineer, 96(7), 63–69. DOI: https://doi.org/10.56330/PNCW8018
Riga, K. (2020). Mixed integer programming for dynamic tower crane and storage area optimization on construction sites. Automation in Construction, 120. https://doi.org/10.1016/j.autcon.2020.103259 DOI: https://doi.org/10.1016/j.autcon.2020.103259
Trevino, C. (2018). Discussion of “location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs” by Zahra Sadat Moussavi Nadoushani, Ahmed W. A. Hammad, and Ali Akbarnezhad. Journal of Construction Engineering and Management, 144(11). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001557 DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001557
Wang, F. (2023). Optimum selection of temperature control measures for combined intake tower in alpine region during construction period. Case Studies in Construction Materials, 18. https://doi.org/10.1016/j.cscm.2023.e01883 DOI: https://doi.org/10.1016/j.cscm.2023.e01883
Wang, H. (2022). Construction Technologies and Conservation Strategies for the Bell Tower of Former Nanking University (Nanjing, China)—A Case Study of a Typical Architectural Heritage of the American Church School in the Late 19th Century. Buildings, 12(12). https://doi.org/10.3390/buildings12122251 DOI: https://doi.org/10.3390/buildings12122251
Xuan, J. (2019). Study on Construction Method of High-Voltage Transmission Tower Beneath Shallow-Buried Tunnel. IOP Conference Series: Earth and Environmental Science, 283(1). https://doi.org/10.1088/1755-1315/283/1/012049 DOI: https://doi.org/10.1088/1755-1315/283/1/012049
Zhang, Z. (2022). Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(7), 2615–2634. https://doi.org/10.1108/ECAM-03-2021-0192 DOI: https://doi.org/10.1108/ECAM-03-2021-0192
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Indonesian Journal of Social Development
This work is licensed under a Creative Commons Attribution 4.0 International License.