Scheduling Analysis using CPM, PERT, and LoB Method

Authors

  • Milinda Nur Indah Puspita Universitas Pembangunan Nasional "Veteran" Jawa Timur
  • I Nyoman Dita Pahang Putra Universitas Pembangunan Nasional "Veteran" Jawa Timur https://orcid.org/0000-0002-5759-049X

DOI:

https://doi.org/10.47134/scbmej.v3i1.5392

Keywords:

CPM, Duration, PERT, Scheduling

Abstract

Project delays frequently occur in construction projects and often result from the inability to accurately identify critical activities within the project network, leading to ineffective time control. Therefore, it is necessary to apply scheduling methods that are appropriate to the characteristics of the project in order to improve time control effectiveness and minimize the risk of delays. The aim of this research is to analyze scheduling results using the Critical Path Method, Program Evaluation and Review Technique, and Line Of Balance method. Also, to determine the difference in project completion duration using the PERT, CPM and LoB Methods. This research employs a quantitative method with a comparative approach, using secondary data that was obtained from a supervisory consultant. The data includes the durations and the work list. The analysis data is obtained to determine the critical path using PERT, CPM and LoB methods. The PERT method calculates three estimation times: optimistic duration, most likely duration, and pessimistic duration to determine the critical path. The results show the CPM and LoB method predicts the completion project in 159 days, and the PERT method predicts the completion project in 164 days. The difference in completing the project using the CMP and PERT methods is 5 days. The difference in project completion duration between LOB and PERT is 5 days. In contrast, no difference is observed between the CPM and LOB methods, as both yield an identical project completion time of 159 days.

Author Biographies

Milinda Nur Indah Puspita, Universitas Pembangunan Nasional "Veteran" Jawa Timur

Civil Engineering

I Nyoman Dita Pahang Putra, Universitas Pembangunan Nasional "Veteran" Jawa Timur

Civil Engineering

References

Abma, V. (2016). Pengendalian Waktu dengan Metode Earned Value pada Proyek Pembangunan Hotel Fave Kotabaru Yogyakarta. Teknisia, 218–228. https://journal.uii.ac.id/teknisia/article/view/8293/7525

Alawiyah, T., Mulyani, Y. S., Gunawan, M. A., Setiaji, R., & Nurdin, H. (2022). Sistem Informasi Manajemen Proyek (SIMAPRO) Berbasis Web (Studi Kasus: PT. Arya Bakti Saluyu). Jurnal Khatulistiwa Informatika, 10(2), 129–135. https://ejournal.bsi.ac.id/ejurnal/index.php/khatulistiwa/article/view/14061

Arianie, G. P., & Puspitasari, N. B. (2017). Perencanaan Manajemen Proyek dalam Meningkatkan Efisiensi dan Efektifitas Sumber Daya Perusahaan (Studi Kasus: Qiscus Pte Ltd). J@ti Undip: Jurnal Teknik Industri, 12(3), 189–196. https://ejournal.undip.ac.id/index.php/jgti/article/view/16393/11991

Badriyah, P. A., Tjakra, J., & Malingkas, G. Y. (2025). Analisis Manajemen Waktu dengan Critical Path Method (CPM) pada Proyek Pembangunan Reservoir SPAM Kota Manado. TEKNO, 23(91), 739–751. https://doi.org/10.35793/jts.v23i91.61847

Ervianto, W. I. (2023). Manajemen Proyek Konstruksi. Penerbit Andi. https://books.google.co.id/books?hl=en&lr=&id=jHLDEAAAQBAJ

Fadila, N., Suliawati, S., & Arfah, M. (2024). Analisis Manajemen Proyek dengan Metode CPM (Critical Path Method) pada Pembangunan Rumah Subsidi di Perumahan Sultan Area City Kota Pinang. Factory: Jurnal Industri, Manajemen dan Rekayasa Sistem Industri, 3(1), 9–19. https://doi.org/10.56211/factory.v3i1.616

Farhan, M. F. F., Rumbyarso, Y. P. A., & Siagian, B. M. (2024). Analisa Penjadwalan Proyek Menggunakan CPM dan PERT pada Proyek Pembangunan Gedung KONI Jakarta Pusat. Jurnal Teknik dan Teknologi Indonesia, 2(3), 1–11. https://doi.org/10.62287/jtti.v2i3.79

Fauzah, D., Setyawan, R., Laksmi, A. A., & Soebakti, S. A. (2024). Optimizing Project Scheduling Using CPM and PERT Methods (Case Study: Pejambon 8-Storey Flat, Central Jakarta). Jurnal Ilmiah Teknik Sipil, 28(2), 116–131. https://doi.org/10.24843/JITS.2024.v28.i02.p02

Fazis, M., & Tugiah, T. (2022). Perencanaan Proyek dan Penjadwalan Proyek. Jurnal Sosial Teknologi, 2(12), 1365–1377. https://doi.org/10.59188/jurnalsostech.v2i12.517

Hadicara, D., Rochim, A., & Pratikso, P. (2023). Penggunaan Metode PERT dan CPM dalam Proyek Pembangunan Jalan. Pondasi, 28(1), 32–44. https://jurnal.unissula.ac.id/index.php/pondasi/article/view/30148

Kharina, F. N., & Sambowo, K. A. (2019). Analisis Keterlambatan Proyek Serta Dampaknya Terhadap Biaya dan Waktu Pelaksanaan Proyek. Jurnal Infrastruktur, 5(1), 13–19. https://doi.org/10.35814/infrastruktur.v5i1.614

Lubis, A. M., Suhendar, E., & Suharmanto, P. (2021). Optimasi Penjadwalan Proyek Pembangunan Jalan Tol Becakayu Seksi 1BC dengan Menggunakan Metode CPM dan PERT. Sustainable Environmental and Optimizing Industry Journal, 3(2), 75–89. https://doi.org/10.36441/seoi.v3i2.461

Megawati, L. A. (2021). Analisis Faktor Keterlambatan Proyek Konstruksi Bangunan Gedung. Jurnal Teknik: Majalah Ilmiah Fakultas Teknik UNPAK, 21(2). https://journal.unpak.ac.id/index.php/jurnalteknik/article/view/3282/2218

Nanda, M. P., Kurniawati, M., & Riswanto, S. (2023). Penggunaan Metode Project Evaluation Review Technique (PERT) dalam Evaluasi Perencanaan Penjadwalan Proyek. Jurnal Teknik Sipil, 163–173. https://doi.org/10.24002/jts.v17i3.7181

Oktafiana, L. O., & Baroroh, I. (2022). Comparative Analysis of CPM, PDM, and PERT Methods in Ship Repair Scheduling Planning KN. RB 309 Ternate 01. Berkala Sainstek, 10(3), 162–174. https://core.ac.uk/download/pdf/542190059.pdf

Pamungkas, P., Panggabean, N., & Suhendra, A. D. R. (2024). Penerapan Manajemen Proyek dalam Peningkatan Waktu pada Proyek Reparasi Crane Lampsone dengan Metode CPM dan PERT. https://www.academia.edu/download/114419196/STUDY_KASUS_MANAJEMEN_PROYEK.pdf

Pramuja, G., Aditya, D., Ridwan, A., Pasaribu, A. B., Hidayat, R., Pasaribuf, L., & Fragastia, V. A. (2025). Implementation of the Critical Path Method (CPM) in the Flower House Construction Project. Industrial Engineering System and Management Journal, 6(2), 69–76. https://doi.org/10.22303/iesm.1.1.2021.01-10

Putra, J. G., & Sekarsari, J. (2020). Analisis Penjadwalan Proyek Gedung Bertingkat dengan Metode PERT dan M-PERT Menggunakan Simulasi Monte Carlo. JMTS: Jurnal Mitra Teknik Sipil, 533–546. https://doi.org/10.24912/jmts.v3i3.8395

Rahmawati, S. D., Putra, I. N. D. P., & Nauli, A. R. (2022). Optimasi Penjadwalan Proyek Konstruksi Menggunakan Metode Least Cost Scheduling. Jurnal Ilmiah MITSU, 10(1), 1–12. https://doi.org/10.24929/ft.v10i1.1177

Ramadhan, T., & Sugiyono, S. (2019). Analisis Optimalisasi Proyek dengan Menggunakan Metode PERT. Indikator, 3(2), 353491. https://www.researchgate.net/profile/Sugiyono-Madelan-2/publication/347974156

Sinurat, F., & Misdalena, F. (2024). Analisis Manajemen Proyek dengan Metode Critical Path Method (CPM) pada Proyek Pembangunan Gedung Chandra Tanjung Karang. Jurnal Konstruksi, 22(2), 98–107. https://doi.org/10.33364/konstruksi/v.22-2.2131

Soeharto, I. (1999). Manajemen Proyek (Dari Konseptual Sampai Operasional). Erlangga. https://nawindah.wordpress.com/wp-content/uploads/2016/05/e-book-manajemen-proyek.pdf

Susanti, R., & Lukman, L. (2019). Studi Eksplorasi Metode Penjadwalan pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Jalan Tol Semarang–Solo Ruas Ungaran–Bawen Paket V). Potensi, 2(1), 3. https://doi.org/10.14710/potensi.2019.3607

Wicaksono, A. F. A., & Putra, I. N. D. P. (2024). Comparison of the S Curve with the CPM Method in Analyzing Project Scheduling. International Journal of Industrial Innovation and Mechanical Engineering, 1(2), 01–12. https://doi.org/10.61132/ijiime.v1i2.18

Yus, F., Nusa, A. B., & Lukman, A. (2023). Analisis Pengendalian Proyek dengan Metode CPM–PERT pada Proyek Jalan dalam Kawasan Hotel Tanjung Lesung Kabupaten Pandeglang. Jurnal Ilmiah Teknik Unida, 4(2), 288–297. https://doi.org/10.55616/jitu.v4i2.656

Yusna, S. N. (2025). Analisis Kinerja Manajemen Konstruksi pada Proyek Gedung di Perguruan Tinggi XYZ. KERN: Jurnal Ilmiah Teknik Sipil, 11(1), 17–26. https://doi.org/10.33005/kern.v11i1.68

Downloads

Published

2026-01-10

How to Cite

Milinda Nur Indah Puspita, & I Nyoman Dita Pahang Putra. (2026). Scheduling Analysis using CPM, PERT, and LoB Method. Sustainable Civil Building Management and Engineering Journal, 3(1), 19. https://doi.org/10.47134/scbmej.v3i1.5392

Issue

Section

Articles