Dyah Ratih Kusumastuti, et al. “Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off Pada Pekerjaan Pipa Jaringan Distribusi Utama Dagen – Plesungan (Studi Kasus: Proyek Spam Wosusokas Segmen 4)”. Sustainable Civil Building Management and Engineering Journal, vol. 1, no. 3, June 2024, p. 11, doi:10.47134/scbmej.v1i3.2769.