Ramadhana, M., Wahyudi, A. and Setyawan, A. (2025) “Comparative Analysis of Volume and Cost of Box Culvert Using Quantity Take Off and Conventional Calculation Methods in Toll Road Project ”, Sustainable Civil Building Management and Engineering Journal, 2(2), p. 9. doi: 10.47134/scbmej.v2i2.4397.