Dyah Ratih Kusumastuti, Ary Setyawan, and Setiono Setiono. 2024. “Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off Pada Pekerjaan Pipa Jaringan Distribusi Utama Dagen – Plesungan (Studi Kasus: Proyek Spam Wosusokas Segmen 4)”. Sustainable Civil Building Management and Engineering Journal 1 (3):11. https://doi.org/10.47134/scbmej.v1i3.2769.