Ramadhana, M., Wahyudi, A., & Setyawan, A. (2025). Comparative Analysis of Volume and Cost of Box Culvert Using Quantity Take Off and Conventional Calculation Methods in Toll Road Project . Sustainable Civil Building Management and EngineeringĀ Journal, 2(2), 9. https://doi.org/10.47134/scbmej.v2i2.4397