Aulia, S., Setiono, S., & Rifai, M. (2024). Cost and Duration Optimization at Building C of Dharmais Cancer Hospital Jakarta with TCTO Method Using Primavera P6 Analysis. Sustainable Civil Building Management and EngineeringĀ Journal, 1(4), 13. https://doi.org/10.47134/scbmej.v1i4.2722