(1)
Aulia, S.; Setiono, S.; Rifai, M. Cost and Duration Optimization at Building C of Dharmais Cancer Hospital Jakarta With TCTO Method Using Primavera P6 Analysis. SCBMEJ 2024, 1, 13.