[1]
Maharani, D.P. et al. 2024. Time and Cost Optimization Analysis of Reservoir Building Work in Wosusokas Regional SPAM Project using Time Cost Trade Off Method. Sustainable Civil Building Management and EngineeringĀ Journal. 1, 4 (Aug. 2024), 12. DOI:https://doi.org/10.47134/scbmej.v1i4.3134.